TM 9-2350-261-34
69.
70.
71.
72.
Remove two screws (1), nuts (2), and
clamps (3), that secure power plant wiring
harness to two brackets (4). Discard clamps.
Install hose (5) and power plant wiring
harness in two brackets (4). Secure with
two screws (1), nuts (2), and two
clamps (3).
Remove screw (6) from oil cooler housing.
Install hose (5) in oil cooler housing. Secure
with screw (6) and clamp (7).
73.
74.
Make sure heater fuel valve (8) is closed.
Install coolant heater fuel pump (9) on
bracket (10). Secure with two screws (11),
four lockwashers (12), and two flat
washers (13).
GO TO NEXT PAGE
14-25