T M41.42.43.44.45.9-2350-261-34Install two insulation tubes (1) on two hoses(2 and 3) on forward side of power plantcompartment rear bulkhead.Install two insulation tubes (1) and twohoses (2 and 3) in power plantcompartment. Secure with three clamps (4)and screws (5).Install ends of insulation tubes (1) on twohoses (2 and 3). Secure with tape.Install hoses (2 and 3) on two elbows (6).Secure with two clamps (7).Install batteries (see your –20) and battery46.47.Cut auxiliary tank hose (11). Secure to tee(12) with two clamps (13).Secure hose (14) to tee (12) withclamp (15).box cover (8) in battery box (9). Securecover to battery box with three wingnuts (10).48. Install hose (14) on elbow (16). Secure withclamp (17).14-22
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business