TM 9-2350-261-34 29.30.31.32.33.34.Install bottom insulation sheet (1), left insu- 35.lation sheet (2), right insulation sheet (3),rear insulation sheet (4), and front insula-tion sheet (5) in battery box (6).36.Install insulation sheet (7) on battery boxcover (8).37.Install two grommets (9) in battery box (6).Place two clamps (10) on heatexchanger (11).Install heat exchanger (11) in batterybox (6).Install two short hoses (12) on heatexchanger (11). Secure with twoclamps (10).38.39.40.Install two elbows (13) in two short hoses(12). Secure with two clamps (14).Remove and discard two blank grommetsfrom power plant bulkhead.Install two grommets (15) in power plantcompartment bulkhead.Thread hose (16) and hose (17) through twogrommets (15) in power plant compartment.Pull two hoses (16 and 17) through twogrommets (15) into personnel compartmentto battery box (6).Install two insulation tubes (18) on twohoses (16 and 17) at rear of power plantcompartment. Secure with tape.GO TO NEXT PAGE14-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business