TM 9-2350-261-20-2
11. Remove five screws (1), lockwashers (2), and 17.
distribution box (3) from hull. Discard
lockwashers.
12. Remove gasket
Discard gasket
(4) from distribution box (3).
18.
INSTALL
19.
13. Install distribution box assembly (3) on hull.
Secure with five screws (1) and new
Iockwashers (2).
20.
21.
14. Install new grommet (5) and circuit 400
lead (6) in distribution box (3).
N O TE
If bilge pump circuit breakers were
removed,
r e f e r t o p a ge
1 6 - 1 2 f or
installation.
I f b i l g e p u m p c i r c u it
breakers were not removed, go to step 17.
15. Connect circuit 450C lead (7) to circuit
breaker (8).
22.
Install new grommet (11 ) and circuit 450B
lead (12) in distribution box (3). Connect
lead to circuit breaker (8),
Install new grommet ( 13) and circuit 450
lead (14) in distribution box (3). Connect
lead to circuit breaker (10).
Install new grommet (15) and circuit 2 lead
(16) in distribution box (3).
Install new grommet (17) and circuit 2A
lead (18) in distribution box (3).
Install circuit 450C lead (7) on bus bar (19).
Secure with new lockwasher (20) and
screw (21).
Install new grommet (22) and circuit 49
lead (23) in distribution box (3). Install cir-
cuit 49 lead (23) on bus bar (19). Secure
with new lockwasher (24) and screw (25).
16. Connect circuit 450A lead (9) to circuit
breaker (10).
12-50