TM 9-2350-261-20-2
R E P L A C E D I S T R I B U T I O N B O X A S S E M B L Y F O R 2 0 0 A M P
G E N E R A T O R S Y S T E M ( M 1 1 3 A 2 , M 1 0 6 A 2 , M 1 2 5 A 2 , A ND
M 1 0 6 4 O N L Y)
D E S C R I P T I O N
This task covers:
Remove (page 12-48).
Install (page 12-50).
I N I T I A L S E T UP
Tools:
General Mechanics Tool Kit (Item 30, App D)
Materials/Parts:
Sealing compound (Item 52, App C)
Gasket
Grommet (8)
Lockwasher (5)
Lockwasher (5)
Personnel Required:
Unit Mechanic
References:
See your -10
Equipment Conditions:
Engine stopped/shutdown (see your 10)
Carrier blocked (see your -10)
Battery ground lead disconnected (page 13-2 )
Master switch panel assembly removed
(page 916)
R E M O VE
3.
1.
2.
For M113A2 carrier, remove screw ( 1),
lockwasher (2), circuit 6 lead (3), and circuit
6L lead (4) from bus bar (5). Remove circuit
6 lead (3), circuit 6L lead (4), and two
grommets (7 and 8) from distribution
box (6). Discard grommets and lockwasher.
4.
For M106A2, M125A2, and M1064 carriers,
remove screw (1), lockwasher (2), and circuit
6 lead (3) from bus bar (5). Remove circuit 6
lead (3) and grommet (7) from distribution
box (6). Discard grommet and lockwasher.
12-48
Change 2
Remove screw (9), lockwasher (10), circuit 10,
14, 15, 27E lead (11), and circuit 450A lead
(12) from bus bar (5). Remove circuit 10, 14,
15, 27E lead (11) and grommet (13) from
distribution box (6). Discard grommet and
lockwasher.
Remove screw (14), lockwasher (15), and
circuit 49 lead (16) from bus bar (5). Remove
circuit 49 lead (16) and grommet (17) from
distribution box (6). Discard grommet and
lockwasher.
