TM 9-2350-261-20-2
N O T E
If bilge pump circuit breakers must be
removed, refer to page 16-12 for removal.
If bilge pump circuit breakers are not to
be removed, go to step 8.
5.
6.
7.
8.
Remove screw (1), lockwasher (2), and
circuit 450C lead (3) from bus bar (4).
Discard lockwasher.
Disconnect circuit 450C lead (3) from circuit
breaker (5).
Remove circuit 450A lead (6) from circuit
breaker (7).
Remove circuit 450 lead (8) from circuit
breaker (7). Remove circuit 45C lead (8) and
grommet (9) from distribution box (10). Dis-
card grommet.
9. Disconnect circuit 450B lead (11) from cir-
cuit breaker (5). Remove circuit 450B lead
(11 ) and grommet (12) from distribution
box (10). Discard grommet.
10. Remove circuit 400 lead (13) and grommet
(14) from distribution box (10). Discard
grommet.
11. Remove grommet (15) and circuit 2 lead
(16) from distribution box (10). Discard
grommet.
12. Remove grommet (17) and circuit 2A lead
(18) from distribution box (10), Discard
grommet.
GO TO NEXT PAGE
12-49