TM 9-2350-261-20-2
4. Remove circuit 2A. lead (1) and grommet (2)
from distribution box (3). Discard grommet.
5. Remove circuit 2 lead (4) and grommet (5)
from distribution box (3). Discard grommet.
6. Disconnect circuit 450 lead (6) from circuit
breaker (7). Remove circuit 450 lead and
grommet (S) from distribution box (3). Dis-
card grommet.
7. Disconnect clrcult. 450B lead (9) from circuit
breaker (10). Remove circuit 450B lead and
grommet (11) from distribution box (3). Dis-
card grommet.
N O T E
If bilge pump circuit breakers are to be
removed, refer to page 1612 for removal.
If the bilge pump circuit breakers are not
to be removed, go to step 11.
8.
9.
10.
11.
Remove screw (12), lockwasher (13), and
circuit 450C lead (14) from bus bar (15).
Discard lockwasher.
Disconnect circuit 450C lead (14) from cir-
cuit breaker (16). Remove circuit 450C lead
from distribution box (3).
Disconnect circuit 450A lead (17) from cir-
cuit breaker (1S). Remove circuit 450A lead
from distribution box (3).
Remove circuit 400 lead (19) and grommet
(20) from distribution box (3). Discard grom-
met.
GO TO NEXT PAGE
12-53