TM 9-2350-261-20-223. Install two new grommets (1 and 2), cableassembly W8 lead (3), and circuit 49lead (4). Install circuit 49 lead (5) andcable assembly W8 leads (6 and 7) on busbar (8). Secure with new lockwasher (9) andscrew (10).24. Install new grommet (11) and circuit 10,14, 15, 27E lead (12) in distribution box(13). Install circuit 10, 14, 15, 27E lead(14) and circuit 450A lead (15) on bus bar(8). Secure with new lockwasher (16) and25. Install new grommet (18) and circuit 6 lead(19) in distribution box (13). Install circuit 6lead (24) and cable assembly W8 leads(20 and 21) on bus bar (8). Secure withnew lockwasher (22) and screw (23).26. Apply one coat of adhesive to cleanedmounting surface of distribution box (13)and one side of new gasket (25).27. Install new gasket (25) on coated mountingsurface of distribution box (13).screw (17).F O L L O W - T O U G H S T E P S1. Install Master Switch Panel (page 9-16).3. Start engine (see your -10). Check thatdistribution box works properly.2. Connect battery ground lead (page 13-2).4. Shutdown engine (see your -10).END OF TASK1 2 - 55
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business