TM 9-2350-261-20-2
13.
14.
Remove five screws ( 1), lockwashers (2), and
distribution box (3) from hull. Discard
lockwasher.
Remove gasket (4) from distribution box (3).
Discard gasket,
INSTALL
15. Install distribution box assembly (3) on hull,
Secure with five screws (1) and new
16.
17.
lockwashers (2).
Install new grommet (5) and circuit 400
lead (6) in distribution box (3).
Install new grommet (7) and circuit 450B
lead (8) in distribution box (3). Connect lead
to circuit breaker (9).
N O T E
If bilge pump circuit breakers were
removed,
refer
to
page
16-12
for
installation.
18. Install new grommet (10) and circuit 450
lead (11) in distribution box (3). Connect
lead to circuit breaker (12).
N O T E
If bilge pump circuit breakers were not
removed, go to step 21.
19.
20.
21.
22.
23.
24.
Connect circuit 450C lead ( 13) to circuit
breaker (9).
Connect circuit 450A lead (14 ) to circuit
breaker (12).
Install new grommet ( 15) and circuit 2 lead
(16) in distribution box (3).
Install new grommet ( 17) and circuit 3 lead
(18) in distribution box (3). Install circuit 3
lead on circuit breaker (19). Secure with
new lockwasher (20) and screw (21).
Install circuit 450C lead (13) on bus bar
(22). Secure with new lockwasher (23) and
screw (24).
Install new grommet (25) and circuit 49
lead (26) in distribution box (3). Install cir-
cuit 49 lead on bus bar (22). Secure with
new lockwasher (27) and screw (28).
12-46