TM 9-2350-261-20-213.14.Remove five screws ( 1), lockwashers (2), anddistribution box (3) from hull. Discardlockwasher.Remove gasket (4) from distribution box (3).Discard gasket,INSTALL15. Install distribution box assembly (3) on hull,Secure with five screws (1) and new16.17.lockwashers (2).Install new grommet (5) and circuit 400lead (6) in distribution box (3).Install new grommet (7) and circuit 450Blead (8) in distribution box (3). Connect leadto circuit breaker (9).N O T EIf bilge pump circuit breakers wereremoved,refer to page 16-12 forinstallation.18. Install new grommet (10) and circuit 450lead (11) in distribution box (3). Connectlead to circuit breaker (12).N O T EIf bilge pump circuit breakers were notremoved, go to step 21.19.20.21.22.23.24.Connect circuit 450C lead ( 13) to circuitbreaker (9).Connect circuit 450A lead (14 ) to circuitbreaker (12).Install new grommet ( 15) and circuit 2 lead(16) in distribution box (3).Install new grommet ( 17) and circuit 3 lead(18) in distribution box (3). Install circuit 3lead on circuit breaker (19). Secure withnew lockwasher (20) and screw (21).Install circuit 450C lead (13) on bus bar(22). Secure with new lockwasher (23) andscrew (24).Install new grommet (25) and circuit 49lead (26) in distribution box (3). Install cir-cuit 49 lead on bus bar (22). Secure withnew lockwasher (27) and screw (28).12-46
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business