TM 9-2350-261-20-212.13.Remove five screws (1), lockwashers (2), and17.distribution box (3) from hull. Discardlockwashers,1S.Remove gasket (4) from distribution box (3).Discard gasket.19.INSTALL14. Install distribution box assembly (3) on hull.Secure with five screws (1) and new20.lockwashers (2).21.22.15. Install new grommet (5) and circuit 400lead (6) in distribution box (3).16. Install new grommet (7) and circuit 450Blead (8) in distribution box (3). Connect cir-cuit 450B lead to circuit breaker (9).Connect circuit 450C lead ( 10) to circuitbreaker (11).Connect circuit 450A lead (12) to circuitbreaker (13).Install 450C lead ( 10) on bus bar ( 14). Se-cure with new lockwasher ( 15) andscrew (16).Install new grommet (17) and circuit 450lead (18) in distribution box (3). Connect cir-cuit 450 lead to circuit breaker ( 19).Install new grommet (20) and circuit 2 lead(21) in distribution box (3).Install new grommet (22) and circuit 2Alead (23) in distribution box (3).N O TEIf bilge pump circuit breakers wereremoved,r e f e r t o p a ge16-12 forinstallation. If the bilge pump circuitbreakers were not removed, go to step 20.12-54
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business