TM 9-2350-261-20-2 21. Install new grommet (1) and circuit 49 lead(2) in distribution box (3). Install circuit 49lead (2) on bus bar (4). Secure with newlockwasher (5) and screw (6).22. Install new grommet (7) and circuit 10, 14,15, 27E lead (8) in distribution box (3). In-stall circuit 10, 14, 15, 27E lead (8) andcircuit 450A lead (9) on bus bar (4). Securewith new lockwasher (10) and screw (11).23. Install new grommet (12) and circuit 6 lead(13 ) in distribution box (3). Install circuit 6lead (13 ) on bus bar (4). Secure with newlockwasher (14) and screw (15).24. Apply one coat of adhesive to cleanedmounting surface of distribution box (16)and one side of new gasket (17).25. Install new gasket (17) on coated mountingsurface of distribution box (16).FOLLOW-THROUGH STEPS 1. Install master switch panel (page 9-16).3. Start engine (see your -10). Check thatdistribution box operates properly.2. Connect battery ground lead (page 13-2).4. Stop engine (see your –10).END OF TASK12-43
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business