28. Place generator drive belt (1) on
pulleys (2, 3).
NOTE
Use straightedge across face of both pul-
leys to assist in proper alignment.
29.
30.
To obtain correct alignment, adjust the
position of the generator mounting bracket
(4) before you tighten the screws (5) in the
slotted holes. Align pulley (2), on generator
(6), with drive pulley (3), on the transfer
gearcase, then tighten screws (5).
Turn turnbuckle (7) until belt deflection at
midspan is 1/25/8 inch (13-16 mm) w
force is applied.
hen
31. Tighten jam nut (8) on turnbuckle (7).
Tighten two nuts (9) on screws (10) that
secure generator (6) to generator mounting
bracket (4).
32. Connect cable (11) to generator (6).
33.
34.
35.
TM 9-2350-261-20-2
Install ground lead (12) on generator
Secure with new Iockwasher (13) and
nut (14).
(6).
Deleted.
Install starter ground lead (15) and
generator ground lead (12) on bracket (16).
Secure with two washers (17), screw (18),
and new locknut (19).
FOLLOW-THROUGH STEPS
1. Connect battery ground lead (page 13-2).
5.
2. Install fan drive belts (page 8-35).
6.
3. Install generator drive belts (page 9-29).
7.
4. While engine is running, check to be sure
that generator and linkage are installed
correctly.
Check generator output (page 3-2).
Stop/shutdown engine (see your-10).
Install power plant rear access panels
(page 24-29).
END OF TASK
Change 1
9-37