40.41.Secure elbow (1) to power plant bulkheadwith locknut (2).Secure tube (3) to elbow (1) and nipplebody (4) with two sleeves (5) and nuts (6).Secure tube (3) to weldnut (7) withclamp (8) and screw (9).TM 9-2350-261-34 43. Install nipple (10) in personnel heater (11).44. Install elbow (12) on nipple (10).45. Secure reducer (13) to elbow (1) withsleeve (14) and nut (15).46. Secure fuel hose (16) to reducer (13) andelbow (12) with two sleeves (17) andnuts (18).GO TO NEXT PAGE11-2142.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business