TM 9-2350-261-34 FOLLOW-THROUGH STEPS 1.2.3.4.5.6.Fill fuel compartment (M106A2 andM125A2) (see your -10).Open fuel shutoff cock (see your -10) andcheck for leaks.Connect battery ground lead (see your –20).Start personnel heater (see your -10) andcheck personnel heater installations forproper operation and leaks.Turn personnel heater OFF (see your –10).Install fuze rack (M106A2) (see your -20).7.8.9.10.11.12.Install fire extinguisher (M106A2 andM125A2) (see your –20).Install front horizontal ammunition racksand supports (M106A2 and M125A2)(see your -20).Install floor plates (see your -20).Install power plant rear access panel(see your -20).Raise and lock ramp (see your -10).Stop engine (see your -10).END OF TASKChange 211-25 (11-26 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business