N O T ECheck gasket on master switch panelflange for cracks or other damage.Replace gasket if damaged.14. Install master switch panel (1) ondistribution box (2). Secure with eightscrews (3), washers (4), and nuts (5).15.16.TM 9-2350-261-20-2 Install ground lead (6) on instrument panelstrut (7). Secure with screw (8), nut (9),and washer (10).Connect circuit 37 lead (11) to circuit 38lead (12).1. connect battery ground leads (page 13-2).3. Start engine (see your -10). Check thatmaster switch panel assembly works properly:2. Connect infrared power supply cable(page 12-134).4. Stop/shutdown engine (see your -10).END OF TASK9-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business