TM 9-2350-261-20-2 13. Install new grommet (1) on ground lead (2).15. Install master switch panel (3) onRoute lead into master switch panel (3), anddistribution box (8). Secure with eightsecure grommet.screws (9), washers (10), and newlocknuts (11).14. Install ground lead (2) on negative post (4)of auxiliary power receptacle (5). Secure16. Connect circuit 37 lead (12) towith screw (6) and new lockwasher (7).connector (13).FOLLOW-THROUGH STEPS 1. Connect infrared power supply cable3.(page 12-134).2. Connect battery ground lead (page 13-2).4.Turn master switch on. Check for properoperation (see your -10).Turn master switch off (see your -10).END OF TASK9-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business