TM 9-2350-261-20-2
13. Install new grommet (1) on ground lead (2).
15. Install master switch panel (3) on
Route lead into master switch panel (3), and
distribution box (8). Secure with eight
secure grommet.
screws (9), washers (10), and new
locknuts (11).
14. Install ground lead (2) on negative post (4)
of auxiliary power receptacle (5). Secure
16. Connect circuit 37 lead (12) to
with screw (6) and new lockwasher (7).
connector (13).
FOLLOW-THROUGH STEPS
1. Connect infrared power supply cable
3.
(page 12-134).
2. Connect battery ground lead (page 13-2).
4.
Turn master switch on. Check for proper
operation (see your -10).
Turn master switch off (see your -10).
END OF TASK
9-18