TM 9-2350-261-20-2 R E P L A C E M A S T E R S W I T C H T O D I S T R I B U T I O N B O XW I R E A S S E M B L Y ( C I R C U I T 4 9 L E A D )( A L L E X C E P T M 5 7 7 A 2 A N D M 1 0 6 8)DESCRIPTION This task covers:Remove (page 9-26).Clean, Inspect, and Repair (page 9-27).Install (page 9-27).INITIAL SETUP Tools:General Mechanics Tool Kit (Item 30, App D)Multimeter (Item 43, App D)Materials/Parts:Grommet (2)Self-locking nut (2)Self-locking nut (8)Personnel Required:Unit MechanicReferences:see your -10Equipment Conditions:Engine Stopped./Shutdown (see your -10)Carrier blocked (see your -10)Battery ground lead disconnected (page 13-2)R E M O VE3.1. Remove eight locknuts (1), washers (2),screws (3), and master switch panel (4) fromdistribution box (5). Discard locknuts.4.2. Early slave receptacle only: remove locknut(6), two washers (7), screw (8), and circuit49 lead (9) from circuit 50 lead terminalLate slave receptacle only: remove locknut(11), circuit 50 lead (12), and circuit 49 lead(13) from master switch terminal (14).Discard locknut.Remove screw (15), washer (16), and circuit49 lead (9) from distribution box busbar (17).lug (10). Discard locknut.9-26Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business