TM 9-2350-261-20-2R E P L A C E M A S T E R S W I T C H P A N E L A S S E M B L Y ( L A T E S L A V ERECEPTACLE) (ALL EXCEPT M577A2 - M1068) DESCRIPTIONThis task covers: Remove (page 9-16).Install (page 9-17).INITIAL SETUP Tools:References:General Mechanics Tool Kit (Item 30, App D)see your -10Materials/Parts:Equipment Conditions:Grommet (3)Engine stopped/shutdown (see your -10)Lockwasher (3)Carrier blocked (see your -10)Self-locking nutBattery ground lead disconnected (page 13-2)Self-locking nut (8)Infrared power supply cable disconnected frommaster switch panel (page 12-134)Personnel RequiredUnit MechanicREMOVE3.1. Disconnect circuitt 37 lead (1) from connec-tor (2).2. Remove eight locknuts (3), washers (4),screws (5), and master switch panel (6) fromdistribution box (7). Discard locknuts.Remove screw (8), lockwasher (9), and groundlead (10) from negative post (11) of auxiliarypower receptacle (12). Remove ground leadand grommet (13) from master switchpanel (6). Discard lockwasher and grommet.9-16Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business