TM 9-2350-261-20-2
5.
6.
7.
Remove nut (1), screw (2), two lockwashers
(3), and circuit 49 lead (4) from auxiliary
power receptacle lead (5). Discard
lockwashers.
Remove locknut (6), screw (7), and circuits 6,
2, and 400 leads (8, 9, and 10) from bus
bar (11). Discard locknut.
N O T E
All carriers with 200 amp generator (ex-
cept M741A1) do step 7.
Remove nut (12), lockwasher (13), and circuit
I N S T A L L
9.
10.
Install two new grommets (17) in master
switch panel assembly (16).
Install circuit 49 and 6 leads (8 and 4)
through two grommets (17) into master
switch panel (16).
N O T E
All carriers with 200 amp generator
(except M741A1) do step 11.
11. Install circuit 2A lead (14) on master switch
terminal (15). Secure with new lockwasher
(13) and nut (12).
2A lead (14) from master switch
terminal (15). Discard lockwasher.
8. Remove master switch panel (16) from
carrier.
12.
13.
Install circuits 6, 2, and 400
leads (8, 9, and 10) on bus bar (11). Secure
with screw (7) and new locknut (6).
Install circuit 49 lead (4) on auxiliary power
receptacle lead (5). Secure with screw (2),
nut (1), and two new lockwashers (3).
9-20