9-2350-261-20-2 T M13.14.15.16.Place plunger rods (1) back in steering17. Install two clevises (11) to two differentiallevers (2). Secure each rod with threebrake levers (12). Secure with clevis pinswashers (3) spring (4) and new spring(13) and new cotter pins (14).pins (5).18. Connect two springs (15) to hullInstall rear screw (6) and locknut (7) inbracket (16).quadrants (8) and bracket (9).C A U T I O NPush quadrants (8) completely down. Tight-Make sure button (17) on top of steeringen two screws (6) and locknuts (7). -Check gap between pawls (10) and qua-drants (8) while moving steering levers (2)as in step 7 above.levers (2) works freely. Pawl (9) must fullyengage quadrant with steering lever backand button pressed. Button must pop Upand pawl disengage from quadrant withslight pull on steering lever. Plunger rods(1) must move freely without binding.FOLLOW-THROUGH STEPS 1. Install air cleaner housing and element3. Install driver’s seat (page 24-127).(page 7-7).4. Operate carrier (see your -10). Check that2. Close power plant front access door and raisesteering brakes operates properly.trim vane (see your -10).END OF TASK23-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business