TM 9-2350-261-20-2
R E P L A C E B I L G E P U M P C I R C U I T B R E A K E R S
DESCRIPTION
This task covers:
Remove (page 16-12).
Install (page 16-13).
INITIAL SETUP
Tools:
General Mechanics Tool Kit (Item 30, App D)
Materials/Parts:
Gasket
Self-locking nut (8)
Self-locking nut (4)
Personnel Required:
Unit Mechanic
Reference:
see your -10
Equipment Conditions:
Engine stopped/shutdown (see your 10)
Carrier blocked (see your -10)
Battery ground lead disconnected (page 13-2)
REMOVE
1.
2.
3.
4.
Remove eight screws (1), washers (2), and
locknuts (3) from master switch panel (4)
and distribution box (5). Pull master switch
panel away from distribution box. Discard
locknuts.
Disconnect circuit 450 lead (6) and circuit
450A lead (7) from front bilge pump circuit
breaker (8).
Disconnect circuit 450B lead (9) and circuit
450C lead (10) from rear bilge pump circuit
breaker (11).
Remove four locknuts (12), screws (13), and
two
tion
circuit breakers (8 and 11) from distribu-
box (5). Discard locknuts,
16-12
