TM 9-2350-261-20-2 R E P L A C E B I L G E P U M P C I R C U I T B R E A K E R SDESCRIPTIONThis task covers:Remove (page 16-12).Install (page 16-13).INITIAL SETUP Tools:General Mechanics Tool Kit (Item 30, App D)Materials/Parts:GasketSelf-locking nut (8)Self-locking nut (4)Personnel Required: Unit MechanicReference:see your -10Equipment Conditions: Engine stopped/shutdown (see your –10)Carrier blocked (see your -10)Battery ground lead disconnected (page 13-2)REMOVE1.2.3.4.Remove eight screws (1), washers (2), andlocknuts (3) from master switch panel (4)and distribution box (5). Pull master switchpanel away from distribution box. Discardlocknuts.Disconnect circuit 450 lead (6) and circuit450A lead (7) from front bilge pump circuitbreaker (8).Disconnect circuit 450B lead (9) and circuit450C lead (10) from rear bilge pump circuitbreaker (11).Remove four locknuts (12), screws (13), andtwotioncircuit breakers (8 and 11) from distribu-box (5). Discard locknuts,16-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business