TM 9-2350-261-20-2 R E P L A C E F R O N T B I L G E V A L V EINITIAL SETUP Tools:References:General Mechanics Tool Kit (Item 30, App D)See your -10Personnel Required:Equipment Conditions: Unit MechanicEngine stopped/shutdown (see your -10)Ramp lowered (see your -10)Materials/Parts:Driver’s rear floor plate removed (page 24-44)Self-locking nut (3)Personnel heater floor duct removed(page 29-47 or 29-48)Left front floor plate removed (page 24-40)REMOVE1. Remove three locknuts ( 1), six washers (2),and three screws (3) from hull crossbeam (4). Discard locknuts.2. Remove valve (5) from beam.CLEAN, INSPECT, ANDInspect valve,REPLACE3. Check valve, housing and fittings for cracks,leaks, and wear. Replace if needed.INSTALL4. Install valve (5) on hull cross beam (4).5. Secure with three screwsand three new locknuts (1).(3), six washers (2),FOLLOW-THROUGH STEPS 1. Check for freedom of movement of valve after4. Install driver’sinstallation.5. Raise and lock2. Install left front floor plate (page 24-40).6. Stop/shutdown3. Install personnel heater floor duct(page 28-47 or 28-48).rear floor plateramp (see your(page 24-44).-10).engine (see your –10).END OF TASK16-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business