TM 9-2350-261-20-2 R E P L A C E F R O N T B I L G E P U M P P I P ESDESCRIPTIONThis task covers:Remove (page 16-5).Install (page 16-6).INITIAL SETUP Tools:General Mechanics Tool Kit (Item 30, App D)Torque Wrench (Item 99, App D)Socket Wrench Set (Item 88, App D)Materials/Parts:GasketGrommetSelf-locking nut (4)Personnel Required: Unit MechanicReferences:See your -10Equipment Conditions: Engine stopped/shutdown (see your -10)Carrier blocked (see your -10)Trim vane lowered (see your -10)Power plant front access door open(see your -10)Hull front access cover removed (page 24-24)Front bilge pump strainer removed(page 16-2, steps 1 and 2)REMOVE1. Remove two screws (1), washers (2), andclamps (3) from two bulkhead weldnuts.2.3.4.5.Loosen four clamps (4). Remove lower pipe(5) from upper pipe (6) and bilge pump.Remove clamp (3), clamps (4), and two hoses(7) from pipe (5).Loosen two clamps (8). Slide pipe (6) fromdischarge outlet and remove pipe from driver’scompartment. Remove clamp (3), clamps (8),and hose (9) from pipe.Remove grommet (10) from driver’s compart-ment bulkhead. Discard grommet.Remove four locknuts (11), washers (12), twoU-bolts (13), sight glass (14), and gasket(15) from pipe (6). Discard gasket andlocknuts.GO TO NEXT PAGE16-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business