TM 9-2350-261-20-2
R E P L A C E F R O N T B I L G E P U M P A N D S T R A I N E R
DESCRIPTION
This task covers:
Remove (page 16-2).
Install (page 16-3).
INITIAL SETUP
Tools:
Personnel Required:
General Mechanics Tool Kit (Item 30, App D)
Unit Mechanic
Adjustable Wrench (Item 80, App D)
Pipe Wrench (Item 86, App D)
References:
See your -10
Materials/Parts:
Sealing compound (Item 46, App C)
Equipment Conditions:
Adhesive (Item 52, App C)
Cushion (3)
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Key washer (3)
Trim vane lowered (see your -10)
Lockwasher (5)
Hull front access cover removed (page 24-24)
Lockwasher (2)
Battery ground lead disconnected (page 13-2)
REMOVE
N O T E
If only strainer is to be replaced, see steps
1.
2.
1, 2, 15, and 16.
Disconnect lead (1) from bilge pump (2).
Remove two screws (3), lockwashers (4), and
strainer (5) from hull weldnuts. Discard
lockwashers.
3. Remove screw (6), three lockwashers (7), and
ground lead (8) from strap (9). Discard
lockwashers.
4. Remove three screws (10), key washers (11),
and two straps (9 and 12). Discard key
washers.
5. Loosen clamp (13). Remove hose (14) from
pump (2).
16-2
