TM 9-2350-261-20-2 23. Install two new grommets (1 and 2), cableassembly W8 lead (3), and circuit 49 lead(4) in distribution box (5). Install circuit 49lead (4) and cable assembly W8 lead (3) onbus bar (6). Secure with new lockwasher (7)and screw (8).24. Install new grommet (9) and circuit 10, 14,15, 27E lead (10) in distribution box (5).Install circuit 10, 14, 15, 27E lead (10) andcircuit 450A lead (11) on bus bar (6). Se-cure with new lockwasher (12) andscrew (13).25. Install new grommet (14) and circuit 6 lead(15) in distribution box (5). Install circuit 6lead (15) and cable assembly W8 leads (3)on bus bar (6). Secure with new lockwasher(16) and screw (17).26. Apply one coat of adhesive to cleanedmounting surface of distribution box (5) andone side of new gasket (18).27. Install new gasket (18) on coated mountingsurface of distribution box (5).FOLLOW-THROUGH STEPS 1. Install master switch panel (page 9-16).3. Start engine (see your -10). Check thatdistribution box operates properly.2. Connect battery ground lead (page 13-2).4. Shutdown engine (see your -10).END OF TASK1 2 - 35
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business