12.
13.
9-2350-261-20-2
Remove five screws (1), lockwashers (2), and
distribution box (3) from hull. Discard
lockwashers.
Remove gasket (4) from distribution box (3).
Discard gasket.
INSTALL
14. Install distribution box assembly (3) on hull.
Secure with five screws (1) and new
Iockwashers (2).
21.
22.
15. Install new grommet (5) and circuit 400
lead (61 in distribution box (3).
NOTE
If bilge pump circuit breakers were
removed,
refer
to
page
16-12
for
installation.
I f b i l g e p u m p
circuit
breakers were not removed, go to step 19.
16. Connect circuit 450C lead (7) to circuit
breaker (8).
17.
18.
19.
20.
Connect circuit 450A lead (9) to circuit
breaker (10).
Install 450C lead (7) on bus bar (11). Se-
cure with new lockwasher ( 12) and
screw (13).
Install new grommet (14) and circuit 450
lead (15) in distribution box (3). Connect cir-
cuit 450 lead (15) to circuit breaker (16).
Install new grommet (17) and circuit 450B
lead (18) in distribution box (3). Connect cir-
cuit 450B lead (18) to circuit breaker (19).
Install new grommet (20) and circuit 2 lead
(21) in distribution box (3).
Install new grommet (22) and circuit 3 lead
(23) in distribution box (3). Install circuit 3
lead (23) on circuit breaker (24). Secure
with new lockwasher (25) and screw (26).
TM
1 2 - 34