T M
10.
11.
9-2350-261-20-2
Remove five screws (1), lockwashers (2), and
distribution box (3) from hull. Discard lock-
washers.
Remove gasket (4) from distribution box (3).
Discard gasket.
INSTALL
12.Install distribution box assembly (3) on hull.
Secure with five screws (1) and new lock-
washers (2).
13. Install new grommet (5) and circuit 400
lead (6) in distribution box (3).
NOTE
If bilge pump circuit breakers were re-
moved, refer to page 16-12 for installa-
tion. If bilge pump circuit breakers were
not removed go to step 16.
15.
16.
17.
18.
Connect circuit 450A lead (9) to circuit
breaker (10).
Install new grommet (11) and circuit 450B
lead (12) in distribution box (3). Connect cir-
cuit 450B lead (12) to circuit breaker (13).
Install new grommet (14) and circuit 450
lead (15) in distribution box (3). Connect cir-
cuit 450 lead (15) to circuit breaker (16).
Install new grommets (17 and 18), circuit
2B lead (19), and circuit 2 lead (20) in dis-
tribution box (3). Install circuit 450C lead
(7), circuit 2B lead (19), and circuit 2 lead
(20) on bus bar (21). Secure with new lock-
washer (22) and screw (23).
14. Connect circuit 450C lead (7) to circuit
breaker (8).
1 2 - 3 8