T M10.11.9-2350-261-20-2Remove five screws (1), lockwashers (2), anddistribution box (3) from hull. Discard lock-washers.Remove gasket (4) from distribution box (3).Discard gasket.INSTALL12.Install distribution box assembly (3) on hull.Secure with five screws (1) and new lock-washers (2).13. Install new grommet (5) and circuit 400lead (6) in distribution box (3).NOTEIf bilge pump circuit breakers were re-moved, refer to page 16-12 for installa-tion. If bilge pump circuit breakers werenot removed go to step 16.15.16.17.18.Connect circuit 450A lead (9) to circuitbreaker (10).Install new grommet (11) and circuit 450Blead (12) in distribution box (3). Connect cir-cuit 450B lead (12) to circuit breaker (13).Install new grommet (14) and circuit 450lead (15) in distribution box (3). Connect cir-cuit 450 lead (15) to circuit breaker (16).Install new grommets (17 and 18), circuit2B lead (19), and circuit 2 lead (20) in dis-tribution box (3). Install circuit 450C lead(7), circuit 2B lead (19), and circuit 2 lead(20) on bus bar (21). Secure with new lock-washer (22) and screw (23).14. Connect circuit 450C lead (7) to circuitbreaker (8).1 2 - 3 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business