TM 9-2350-277-20-5
REPLACE TUBE FROM RAMP CONTROL VALVE TO BULKHEAD Continued
0664 00
INSTALLATION
1.
Install nipple (1) in bulkhead and secure with jam nut (2).
2.
Connect hose (3) to nipple (1).
3.
Place three clamps (4) on tube (5).
4.
Install tube (5) on tee or elbow (6) of ramp control valve (7).
5.
Align three clamps (4) with power plant compartment holes.
6.
Secure with three screws (8), washers (9), and new locknuts (10).
0664 00-3