Tag all cables before disconnecting them.
NOTE
11. Disconnect W111, plug P1 (1) from jack
J115 (2) on signal patch panel box (3).
12. Disconnect W112, plug P1 (4) from jack
J116 (5) on signal patch panel box (3).
13. Disconnect W113, plug P1 (6) from jack
J117 (7) on signal patch panel box (3).
14. Disconnect W114, plug P1 (8) from jack
J118 (9) on signal patch panel box (3).
15. Remove cable
helper assist.
INSTALL
assemblies from carrier. Have
16.
17.
Install cable assemblies in carrier. Have
helper assist.
Push harness into base (10) of external com-
munications box (11). Have helper assist.
18. Connect W111, plug P1 (1) to jack J115 (2)
on signal patch panel box (3).
19. Connect W112, plug P1 (4) to jack J116 (5)
on signal patch panel box (3).
20.
21.
22.
23.
24.
25.
Connect W113, plug P1 (6) to jack J117 (7)
on signal patch panel box (3).
Connect W114, plug P1 (8) to jack J118 (9)
on signal patch panel box (3).
Connect harness to inside of faceplate (12)
of external communications box (11).
Connect W111, plug P2 (13) to jack
5115 (14) on faceplate (12).
Connect W112, plug P2 (15) to jack
J116 (16) on faceplate (12).
Connect W113, plug P2 (17) to jack
J117 (18) on faceplate (12).
TM 9-2350-261-34
26. Connect W114, plug P2 (19) to jack
J118 (20) on faceplate (12).
27. Install clamp (21) and screw (22).
28. Install five clamps (23) and screws (24).
29. Install new straps (25) as required.
30. Install faceplate (12) on external
communications box (11), secure with 14
screws (26) and new lockwashers (27).
31. Lower and secure cover (28) of external
communications box (11).
FOLLOW-THROUGH STEPS
1. Install external communication box
(see your -20)
END OF TASK
Change 4
21.1-59