Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REMOVE - TM-9-2350-261-34_528
REMOVE - TM-9-2350-261-34_530
TM-9-2350-261-34 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
499
500
501
502
503
504
505
506
507
508
509
TM 9-2350-261-34
REPLACE RF 1,2,3,4
CABLE ASSEMBLIES
W111, W112, W113, AND W114 (M1068 ONLY)
DESCRIPTION
This task covers:
Remove (page 21.1-58).
Install (page 21.1-59).
INITIAL SETUP
Tools
Personnel Required (cont):
Electronic Equipment Tool Bit
(Item 94.1, App B)
Material/Parts:
Lockwasher (14)
Straps
Personnel Required
Radio Repairer 29E10
Helper
(H)
References:
See your -20
Equipment Conditions:
External communication box removed
(see your -20)
REMOVE
1. Lift and secure cover (1) of external
communications box (2).
2. Remove 14 screws (3),
lockwashers
(4), and
faceplate (6) from external
communications
box (2). Discard
lockwashers
.
NOTE
Tag all cables before disconnecting them.
3. Disconnect W111, plug P2
J115 (7) on faceplate (5).
(6) from jack
4. Disconnect W112, plug P2
J116 (9) on faceplate (5).
(8) from jack
5. Disconnect W113, plug
J117 (11) on faceplate
P2
(5).
(10) from jack
6. Disconnect W114, plug P2 (12) from jack
J118 (13) on faceplate (5).
7. Remove and discard straps (14) as required.
8. Remove five clamps (15) and screws (16).
9. Remove clamp (17) and screw (18).
10. Pull harness through base (19) of
communications
box (2). Have helper assist.
21.1-58
Change 4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business