TM 9-2350-261-34
29. Install terminal block TB1 (1) on cover (2)
and secure with two screws (3) and new
locknuts (4).
30. Install terminal block TB2 (5) on cover (2)
and secure with four screws (6) and new
locknuts (7).
31. Install cover (2) on inverter housing (8) and
secure with ten screws (9) and new
lockwashers (10).
FOLLOW-THROUGH STEPS
1. Install power control enclosure (see your -20).
2. Connect battery ground lead (see your -20).
END OF TASK
21.1-14
Change 4