TM 9-2350-261-34
R E P A I R R O A D S I D E A N D C U R B S I D E D A T A P A N E L A S S E M B L I E S
A 1 2 A N D A 1 3 ( M 1 0 6 8 O N L Y )
D E S C R I P T I ON
This task covers: Remove (page 21.1-19).
Clean, Inspect, and Repair (see Chapter 2).
Install (page 21.1-21).
INITIAL SETUP
Tools:
References
Radio Equipment Tool Kit (Item 94.2, App B)
See your -10
See your -20
Materials/Parts
Locknut (4)
Equipment conditions:
Lockwasher (14)
Data box removed (see your -20)
Personnel Required:
Radio Repairer 29E10
NOTE
Tag all leads before removal for proper
installation later.
Follow illustration for remove/install of
red/black binding posts.
See wiring diagram for disassem-
ble/assemble of wires to connec-
tors/binding posts.
1. Remove 14 screws (1), lockwashers (2), and
faceplate (3) from box (4). Discard
lockwashers.
2. Disconnect leads (5) from 24 binding
posts (6).
GO TO NEXT PAGE
Change 4
21.1-19