TM 9-2350-261-34
NOTE
Tag
leads/cables
removing/disconnecting..
before
7. Remove screw (9), two ground leads E5 (13),
and lockwasher (12) from carrier wall.
Discard lockwasher.
4. Remove ten screws (1), cable W5 (2), and six
leads (3) from terminal block TB2 (4).
5. Remove two set screws (5), cable W6 (6), and
two leads E4 (7) from terminal
block TB1 (8).
8. Remove three screws (14), locknuts (15), six
washers (16), from blackout curtain (17) and
inverter housing (18). Discard locknuts.
9. Disconnect two cable W15 connectors (19)
from inverter IN1 (20) and inverter IN2 (21).
6. Remove screw (9), ground lead W632 (10),
ground lead W432 (11), and lockwasher (12)
from carrier wall. Discard lockwasher.
21.1-10
Change 4