TM 9-2350-261-34
120. Open heater fuel valve (1).
FOLLOW-THROUGH STEPS
1.
2.
3.
4.
5.
6.
Install personnel heater (see your -20).
7.
Lower power plant grill (see your -20).
8.
Fill carrier cooling system (see your -20).
9.
Connect battery ground lead (see your -20).
Bleed coolant heater fuel line (see your -20).
10.
Start coolant heater (see your -10). Check for
leaks and proper operation. Turn coolant
11.
heater off.
12.
Install front floor plate (see your -20).
Install drivers power plant access panel
(see your -20).
Install power plant rear access panel
(see your -20).
Close power plant front access door and
raise trim vane (see your -10).
Raise and lock ramp (see your -10).
Stop engine (see your -10).
END OF TASK