TM 9-2350-261-34 65.66.67.68.69.Remove two screws (1), nuts (2), andclamps (3) that secure power plant wiringharness to two brackets (4). Discard clamps.Install hose (5)harness on twotwo screws (1),clamps (3).Remove screw (Install hose (5)with screw (6)Make sure heater fuel valve (8) is closed.GO TO NEXT PAGEChange 214-41
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business