TM 9-2350-261-34
65.
66.
67.
68.
69.
Remove two screws (1), nuts (2), and
clamps (3) that secure power plant wiring
harness to two brackets (4). Discard clamps.
Install hose (5)
harness on two
two screws (1),
clamps (3).
Remove screw (
Install hose (5)
with screw (6)
Make sure heater fuel valve (8) is closed.
GO TO NEXT PAGE
Change 2
14-41