Install insulation tube (1) on hose (2) and
secure with tape.
Install hose (2) on shutoff cock (3). Secure
with clamp (4).
Install hose (2) on two weldnuts (5). Secure
with two screws (6) and clamps (7),
Install two elbows (8) to power plant
compartment bulkhead. Secure with two
nuts (9).
Install two hoses (10) on two elbows (8).
Secure with two clamps (11).
52.
53.
54.
55.
56.
Remove two screws (12) that secure person-
nel heater duct to floor plate.
Install
heater
screws
Install
Secure
Install
two hoses (10), clamps (13) and
duct on floor plate. Secure with two
(12).
insulation tubing (14) on hose (15).
with insulation tape.
two hoses (15 and 16) on two elbows
(8). Secure with two clamps (17).
Install hose (16) on side of sponson. Secure
with three clamps (18) and screws (19).