TM 9-2350-261-34 FOLLOW-THROUGH1.2.3.4.5.6.7.Install personnel heaterLower power plant grillSTEPSsee your –20).8.see your –20).9.Fill carrier cooling system (see your –20).Fill coolant heater cooling system10.(see your –20).Connect battery ground lead (see your -20).11.Bleed coolant heater fuel line (see your -20).12.Start coolant heater (see your -10). Check forleaks and that heater operates properly. Turn 13.heater off.14.Install rear and right front floor plates(see your –20).Install driver’s power plant access panel(see your –20).Install power plant rear access panel(see your -20).Close power plant front access door andraise trim vane (see your –10).Raise and lock ramp (see your -10).Stop engine (see your -10).Install generator set (see your -10).14-32END OF TASK
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business