TM 9-2350-261-34
83. Install hose (1) on shutoff cock (2). Secure
87. Install hose (4) and power plant wiring
with clamp (3).
harness on two brackets (13). Secure with
two screws (10), nuts (11), and clamps (12).
84. Install hose (4) on sponson. Secure with
screw (5) and clamp (6).
88. Remove screw (14) from oil cooler housing.
85. Install hose (4) on weldnut (7). Secure with
89. Install hose (4) on oil cooler housing. Secure
screw (8) and clamp (9).
with screw (14) and clamp (15).
86. Remove two screws (10), nuts (11), and
clamps (12) that secure power plant wiring
harness to two brackets (13). Discard
clamps.
GO TO NEXT PAGE
14-11