TM 9-2350-261-34
113.
114.
115.
Install wiring harness (1) on two weldnuts
116. Lower power plant grill assembly
(2). Secure with two clamps (3) and
( see your 20).
screws (4).
117. Remove four screws (10), washers (11),
Remove three screws (5) and clamps (6)
and plate from grill. Discard plate.
that secure fuel control cable (7) to three
weldnuts (8).
118. Install upper tube (12) on exhaust pipe
(13). Secure with clamp (14). Do not
Install wiring harness (1) and fuel control
tighten.
cable (7) on three weldnuts (8). Secure
with three screws (5), clamps (6), and
119. Position upper tube
clamps (9).
on grill.
12) and gasket (15)
120. Secure upper tube (12) to grill with four
screws (10) and washers (11).
121. Tighten clamp (14).
GO TO NEXT PAGE
14-15