T M74.75.76.77.78.9-2350-261-34On M113A2 only, install two hoses (1 and2) through four brackets (3) on rightsponson.Install two insulation tubes (4) on two hoses(1 and 2) on forward side of power plantcompartment rear bulkhead.Install two insulation tubes (4) and twohoses (1 and 2) on power plantcompartment. Secure with three clamps (5)and screws (6).Secure ends of all insulation tubes (4) totwo hoses (1 and 2) with tape.Secure two hoses (1 and 2) to heatexchanger (7) with two clamps (8).79.80.81.82.On M741A1 only, install two short hoses (9)on heat exchanger (7). Secure with twoclamps (8).On M741A1 only, install two elbows (10) ontwo short hoses (9). Secure with twoclamps (11).On M741A1 only, secure hoses (1 and 2) totwo elbows (10) with two clamps (12).Install batteries in battery box(see your –20). Install battery box cover (13)on battery box (14).14-10