T M
74.
75.
76.
77.
78.
9-2350-261-34
On M113A2 only, install two hoses (1 and
2) through four brackets (3) on right
sponson.
Install two insulation tubes (4) on two hoses
(1 and 2) on forward side of power plant
compartment rear bulkhead.
Install two insulation tubes (4) and two
hoses (1 and 2) on power plant
compartment. Secure with three clamps (5)
and screws (6).
Secure ends of all insulation tubes (4) to
two hoses (1 and 2) with tape.
Secure two hoses (1 and 2) to heat
exchanger (7) with two clamps (8).
79.
80.
81.
82.
On M741A1 only, install two short hoses (9)
on heat exchanger (7). Secure with two
clamps (8).
On M741A1 only, install two elbows (10) on
two short hoses (9). Secure with two
clamps (11).
On M741A1 only, secure hoses (1 and 2) to
two elbows (10) with two clamps (12).
Install batteries in battery box
(see your 20). Install battery box cover (13)
on battery box (14).
14-10