TM 9-2350-261-34 FOLLOW-THROUGH STEPS 1.2.3.Connect battery ground negative lead(see your -20).5.Open heater fuel shutoff valve (see your–10).4. Install floor plates (see your –20).6.Start heater. Check that it is properlyinstalled. Turn heater OFF (see your –10).stopRaise and lock ramp (see your –10).END OF TASKengine (see your –10).13-11 (13-12 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business