TM 9-2350-261-34
R O D D I N G
22.
23.
Heat melt and wire brush off the solder
that secures two side brackets (1 and 2) to
two end tanks (3 and 4).
Heat melt and wire brush off the solder
that secures two end tanks (3 and 4) to
core (5).
26. Insert a metal rod (7) long enough and
slightly smaller in diameter than tubes (6)
through tubes to remove blockage.
27. clear tubes (6) until water flows through
freely.
28.
24. Wire brush rust, scale, and sediment from
29.
core tube openings.
25. Locate plugged tubes (6) by directing water
into tubes. Check for flow at opposite end.
30.
Install end tanks (4 and 3) on Core (5).
Secure with acid core solder.
Install two side brackets (2 and 1) on two
end tanks (4 and 3). Secure with acid core
solder.
Pressure test radiator (see steps 2-6).
FOLLOW-THROUGH STEPS
1. Install radiator in earner (see your 20).
END OF TASK
5-4