TM 9-2350-261-20-2 FOLLOW-THROUGH STEPS W A R N I N G1. Start engine and check fan for properStartup of equipment oroperation (see your –10).moving parts could injureyou or others. If other per-2. Stop/shutdown engine (see your -10).sonnel are working on yourcarrier, be sure you know3. Install power plant rear access panelwhat they are doing. Place(page 24-27 or 24-29).DO NOT OPERATE tags on MASTERSWITCH when needed to prevent startup.END OF TASK8 - 4 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business