TM 9-2350-261-20-2 R E P L A C E A U X I L I A R Y T A N K D E A E R A T I O N H O S ESINITIAL SETUPTools:Equipment Conditions:General Mechanics Tool Kit (Item 30, App D)Engine stopped/shutdown (see your -10)Carrier blocked (see your -10)Personnel Required:Trim vane lowered and power plant frontUnit Mechanicaccess door open (see your -10)Coolant drained (page 8-3)References:See your -10REMOVEINSTALL1. Remove two clamps (1) and two deaeration3. Secure two hoses (2) to elbowshoses (2) from two elbows (3).clamps (1).2. Remove clamp (4) from elbow (5), and clamp4. Secure two hoses (2) to elbows(6) from elbow (7).with clamps (4 and 6).(3) with(5 and 7)FOLLOW-THROUGH STEPSW A R N I N G1. Fill cooling system (page 8-5).Wearinglooseclothingaround moving parts can2. Start engine (see your -10). Check for leaks.a l l o w p e r s o n n e l t o g etcaught and cause injury or3. Stop engine/shutdown (see your -10).death. Tuck in loose cloth-ing.4. Close power plant front access door and raisetrim vane (see your -10).END OF TASK8-323. Remove two hoses from carrier.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business