TM 9-2350-261-20-2 R E P L A C E A U X I L I A R Y T A N K T O R A D I A T O R T U B EINITIAL SETUPTools:References:General Mechanics Tool Kit (Item 30, App D)See your –10Materials/Parts:Equipment Conditions:Sealing compound (Item 46, App C)Engine stopped/shutdown (see your -10)Carrier blocked (see your -10)Personnel Required:Power plant grill raised (page 5-2)Unit MechanicREMOVE1. Remove two clamps (1) and hose (2) fromtwo adapters (3).2. Remove two adapters (3) from auxiliarytank (4) and radiator (5).INSTALL3. Apply a thin, even coat of sealing compoundto external threads of two adapters (3).4.5.Install two adapters (3) in auxiliary tank (4)and radiator (5).Secure hose (2) to two adapters (3) with twoclamps (1).FOLLOW-THROUGH STEPS 1. Lower power plant grill (page 5-2).W A R N I NG2. Start engine (see your -10). Check forWearing loose clothingaround moving parts can3. Stop/shutdown engine (see your -10).allow personnel to getcaught and cause injury or4. Close power plant door (see your -10).d e a t h . T u c k i n l o o seclothing lleaks.END OF TASK8-31
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business