TM 9-2350-261-20-2R E P L A C E F I N A L D R I V E F I L L E R T U B E A N D D I P S T I C KDESCRIPTIONThis task covers:Remove (page 20-12).Clean, Inspect, and Replace (page 20-12).Install (page 20-13).I N I T I A L S E T UPTools:References:General Mechanics Tool Kit (Item 30, App D)See your –10Materials/Parts:Equipment Conditions:Antiseize compound (Item 4, App C)Trim vane lowered (see your -10)Sealing compound (Item 46, App C)Power plant front access door openKey washer(see your –10)Preformed packingFinal drive removed (page 20-9)Personnel Required:Unit MechanicR E M O V E1.2.Turn dipstick (1) to the left and remove fromoil filler tube (2).Remove screw (3), key washer (4), and clamp(5) from final drive (6). Discard key washer.3.4.5.6.7.Remove nut (7) from elbow (8).Remove vent tube (9) from elbow (10).Remove filler tube (2) and vent tube (9) fromfinal drive (6).Remove elbow (10) from final drive (6).Loosen nut (11). Remove elbow (8) andpreformed packing (12) from final drive (6).Discard packing.C L E A N , I N S P E C T , A N D R E P L A C E8. Check parts and housing for cracks,damage, and wear. Replace as needed.20-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business