TM9-2350-261-20-2I N S T A L L9. Install new preformed packing (1) and elbow(2) in final drive (3). Secure with nut (4).10. Apply a light coat of sealing compound tothreads of elbow (5).11. Install elbow (5) in final drive (3).12. Install vent tube (6) on elbow (5).13. Connect filler tube (7) to vent tube (6) andelbow (2). Do not tighten nut (8).16.17.14.15.Apply a light coat of antiseize compound tothreads of screw (9).Secure filler tube (7) to final drive (3) withclamp (10), new key washer (11), andscrew (9).Tighten nut (8) to secure filler tube (7) toelbow (2).Install dipstick (12) in filler tube (7) andturn to the right to lock.F O L L O W - T H R O U G H S T E P S1. Install final drive (page 20-9).3. Raise trim vane (see your -10).2. Close power plant front access door(see your -10).END OF TASK20-13 (20-14 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business