TM9-2350-261-20-2
I N S T A L L
9. Install new preformed packing (1) and elbow
(2) in final drive (3). Secure with nut (4).
10. Apply a light coat of sealing compound to
threads of elbow (5).
11. Install elbow (5) in final drive (3).
12. Install vent tube (6) on elbow (5).
13. Connect filler tube (7) to vent tube (6) and
elbow (2). Do not tighten nut (8).
16.
17.
14.
15.
Apply a light coat of antiseize compound to
threads of screw (9).
Secure filler tube (7) to final drive (3) with
clamp (10), new key washer (11), and
screw (9).
Tighten nut (8) to secure filler tube (7) to
elbow (2).
Install dipstick (12) in filler tube (7) and
turn to the right to lock.
F O L L O W - T H R O U G H S T E P S
1. Install final drive (page 20-9).
3. Raise trim vane (see your -10).
2. Close power plant front access door
(see your -10).
END OF TASK
20-13 (20-14 blank)