TM9-2350-261-20-2
R E P L A C E F I N A L D R I VE
D E S C R I P T I O N
This task covers:
Remove (page 20-9).
Clean, Inspect, and Repair (page 20-10).
Install (page 20-10).
I N I T I A L S E T U P
Tools:
General Mechanics Tool Kit (Item 30, App D)
Lifting Bar (Item 12, App D)
Torque Wrench (Item 96, App D)
Materials/Parts:
Antiseize compound (Item 4, App C)
Personnel Required:
Unit Mechanic
Helper
References:
See your -10
See your LO
Equipment Conditions:
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Power plant front access door opened
(see your -10)
Final drive yoke removed (page 20-5)
Track shroud removed (page 22-2)
Track removed from drive sprocket
(page 22-4)
Trim vane lowered (see your -10)
Track drive sprocket removed from final drive
(page 22-30)
REMOVE
1.
.
2.
3.
4.
If left final drive is to be removed, remove
hull front access cover (page 24-24). Remove
left final drive speedometer cable and adapter
(page 11-17).
Drain final drive (see your LO).
W A R N I N G
The final drive is heavy and
can cause back injury if
handled improperly. Be
sure to use a hoist or a
helper
to remove final
drive.
Secure lifting bar (1) to final drive (2) with
two sprocket mounting screws (3).
Attach suitable lifting device of at least
165 lb (75 kg) capacity to lifting bar (1).
5. Remove 17 screws (4), washers (5), and final
drive (2) from hull (6).
GO TO NEXT PAGE
20-9