TM 9-2350-261-20-2
INSTALL
N O T E
If replacing lead, cut new wire from bulk
supply. Measure original length, gage,
and type of wire.
9.
10.
11.
Strip insulation from leads of cable (1) to
expose just enough wire to fill holes in
contacts (2).
Slide retaining nut (3) and coupling nut (4)
on cable (1).
Push leads of cable (1) through grommet (5)
and insert in new contacts (2).
N O T E
Make sure leads pass through proper
lettered holes in grommet.
12.
13.
Solder leads of cable (1) in contacts (2) and
press contacts into grommet (5). Use
soldering gun.
Align and install grommet (5) in plug (6).
Secure with retaining nut (3).
FOLLOW-THROUGH STEPS
1. Use multimeter to perform continuity check
3. Turn MASTER SWITCH ON to check for
before connecting batteries.
proper cable repair.
2. Connect battery ground lead (page 13-2).
4. Turn MASTER SWITCH OFF (see your -10).
END OF TASK
14-10