TM 9-2350-261-20-2
R E P A I R W I R I N G H A R N E SS
DESCRIPTION
This task covers:
Remove (page 14-3).
Install (page 14-5).
INITIAL SETUP
Tools:
General Mechanics Tool Kit (Item 30, App D)
Hacksaw Blade (Item 14, App D)
Hacksaw Frame (Item 27, App D)
Soldering Gun (Item 34, App D)
Heater Gun (Item 35, App D)
Digital Multimeter (Item 43, App D)
Electrical Tool Kit (Item 75, App D)
Materials/Parts:
Insulation sleeving (Item 21 thru 25, App C)
Solder (Item 57, App C)
Personnel Required:
Unit Mechanic
References:
See your -10
See your -24P
Equipment Conditions:
Engine stopped/shutdown (see your 10)
Carrier blocked (see your -10)
Battery ground lead disconnected (page 13-2)
REMOVE
1. Remove male connector from harness lead.
a.
b.
c.
Slide shell (1) back on lead (2).
Clip contact pin (3) from lead (2). Discard
pin.
Remove washer (4) or slotted washer (5)
and shell (1) from lead (2).
d. Remove sleeve (8) and shell (6) from
lead (7).
3. Remove terminal connector from harness lead.
a. If lead (10) has nipple (11), slide nipple
back on lead.
2. Remove female connector from harness lead,
a. Slide shell (6) back on lead (7).
b. Slide sleeve (8) back from contact
socket (9).
c. Clip socket (9) from lead (7). Discard
socket.
GO TO NEXT PAGE
14-3
